Term and Condition Plan (type 1)
| # | Column | Description |
|---|---|---|
| General | ||
| 0 | Plan ID | Plan ID |
| 0 | River ID | Plan location on the River network |
| 0 | Year | Year of the simulation |
| 0 | Mo | Month of the simulation |
| 1 | From Exc_Byp | Total amount exchanged/bypass by opr rules with associated T&C Plan |
| 2 | Plan Demand | T&C Plan demand at this time step |
| 3 | Src 1 | Water source 1 |
| .. | .. | .. |
| .. | .. | .. |
| 22 | Src 20 | Water source 20 |
| 23 | Short | Plan shortage |
| 24 | Total | Total of all sources |