Skip to content

Plan Demand Reset (ityopr=42)

The type 42 operating rule provides a method to reset a plan demand. The following are noted:

  • Because a type 42 rule does not provide a water supply it should, in general, only be used be used to mimic historical operations and/or restrict an operational activity to annual operations.
  • Source 1 should be one of the following plan types: 1 = Term and Condition, 2 = Well Augmentation, 9 = Out-of-Priority Plan.
Row-data Variable Description
Control Data
1 Format (a12, a24, 12x, 4x, f12.5, f8.0, i8, 3(1x,a12,i8), i8, 1x,a12, 1x,a12, 1x,2f8.0, 2i8)
1-1 cidvri(1) Operational right ID
1-2 nameo(1) Operational right name
1-3 rtem(1) Administration number
1-4 dumx Monthly Switch
0 = No monthly on/off values
12 = Monthly on/off switches
1-5 ioprsw(1) Annual On/Off Switch
0 = off
1 = on
+n = Begin in year n
-n = Stop after year n
Destination Data
1-6 ciopde NA
1-7 iopdes(2,1) 0
Supply Data
1-8 ciopso(1) ReUse plan ID
1-9 iopsou(2,1) Enter 0
1-10 ciopso(2) NA
1-11 iopsou(4,1) 0
Type Data
1-12 ityopr(1) 42
Associated Plan Data
1-13 creuse NA
Diversion Type
1-14 cdivtyp NA
Conveyance Loss (%)
1-15 OprLoss 0
Miscellaneous Limits
1-16 OprLimit 0
Start Date
1-17 IoBeg First year of operation
End Date
1-18 IoEnd Last year of operation
Monthly Data
2 Free Format (Include only if the variable (dumx) = 12 or less than -12
2-1 imonsw(1) Monthly switch 0 = off, 1 = on
+n = Day first used that month
-n = Day last used that month
Note the first entry corresponds to the first month specified in the control file