Plan Demand Reset (ityopr=42)
The type 42 operating rule provides a method to reset a plan demand. The following are noted:
- Because a type 42 rule does not provide a water supply it should, in general, only be used be used to mimic historical operations and/or restrict an operational activity to annual operations.
- Source 1 should be one of the following plan types: 1 = Term and Condition, 2 = Well Augmentation, 9 = Out-of-Priority Plan.
Row-data | Variable | Description |
---|---|---|
Control Data | ||
1 | Format (a12, a24, 12x, 4x, f12.5, f8.0, i8, 3(1x,a12,i8), i8, 1x,a12, 1x,a12, 1x,2f8.0, 2i8) | |
1-1 | cidvri(1) | Operational right ID |
1-2 | nameo(1) | Operational right name |
1-3 | rtem(1) | Administration number |
1-4 | dumx | Monthly Switch |
0 = No monthly on/off values | ||
12 = Monthly on/off switches | ||
1-5 | ioprsw(1) | Annual On/Off Switch |
0 = off | ||
1 = on | ||
+n = Begin in year n | ||
-n = Stop after year n | ||
Destination Data | ||
1-6 | ciopde | NA |
1-7 | iopdes(2,1) | 0 |
Supply Data | ||
1-8 | ciopso(1) | ReUse plan ID |
1-9 | iopsou(2,1) | Enter 0 |
1-10 | ciopso(2) | NA |
1-11 | iopsou(4,1) | 0 |
Type Data | ||
1-12 | ityopr(1) | 42 |
Associated Plan Data | ||
1-13 | creuse | NA |
Diversion Type | ||
1-14 | cdivtyp | NA |
Conveyance Loss (%) | ||
1-15 | OprLoss | 0 |
Miscellaneous Limits | ||
1-16 | OprLimit | 0 |
Start Date | ||
1-17 | IoBeg | First year of operation |
End Date | ||
1-18 | IoEnd | Last year of operation |
Monthly Data | ||
2 | Free Format (Include only if the variable (dumx ) = 12 or less than -12 |
|
2-1 | imonsw(1) | Monthly switch 0 = off, 1 = on |
+n = Day first used that month | ||
-n = Day last used that month | ||
Note the first entry corresponds to the first month specified in the control file |