Skip to content

Well Augmentation Plan (type 2 and 10)

# Column Description
General
0 Plan ID Plan ID
0 River ID Plan location on the River network
0 Year Year of the simulation
0 Mo Month of the simulation
1 From Well Augmentation Well Pumping
2 Plan Demand Augmentation Plan Demand at this time step. Plan Demand is well depletion less return flow from this plans pumping. Plan Demand will be zero for Special Aug Plans.
3 Src 1 Water source 1
.. .. ..
.. .. ..
22 Src 20 Water source 20
23 Short Plan shortage
24 Total Total of all sources