Out-of-Priority Plan (type 9)
# | Column | Description |
---|---|---|
General | ||
0 | Plan ID | Plan ID |
0 | River ID | Plan location on the River network |
0 | Year | Year of the simulation |
0 | Mo | Month of the simulation |
1 | Initial Demand | OOP Plan demand at beginning of time step |
2 | Demand Total | OOP Plan demand at this time step |
3 | Src 1 | Water source 1 |
.. | .. | .. |
.. | .. | .. |
22 | Src 20 | Water source 20 |
23 | Total | Total of all sources |
24 | Ending Demand | OOP Plan demand at end of time step |